Storage projects don’t stumble because the idea is bad—they stumble because they miss the tests buyers actually use. Deals that get built clear three gates: bankable cash flows that a credit committee can defend, 4–12 hours of deliverable energy at a price utilities can live with, and a safety plan that wins early buy-in from local fire safety personnel.

These insights come straight from industry leaders interviewed on the Beyond Lithium podcast.

1) Bankability wins deals — because credit committees don’t fund hypotheticals Procurement defaults to tech that already clears diligence. That’s why lithium often wins today: it’s defendable to credit committees and communities now. Energy Storage subject matter experts agree that capital will flow to projects that pencil today, not on promises. Utility engineer Kieran Claffey puts it bluntly: “It comes out to capex.” Translation for developers: hit the technical minimums, then prove whole-life economics—capex, O&M, replacements, and availability—on a duty cycle the buyer actually needs.

2) Medium duration (8–12 hours) is the next bottleneck Integrated resource plans (IRPs) from state public utility commissions (PUCs) want energy shifted across the day. Multiple guests point to 8–12-hour storage as the “prime problem” for integrating more renewables. Claffey says utilities are asking for a “cheap, cheap 10 hour battery” that’s safe and reliable—the kind of offer that would move alternatives into contention, not just discussion. For developers, designs that let you size power and energy separately will pencil faster as durations stretch.

3) Safety decides timelines — design with first responders on day one Community trust hinges on visible preparation: early meetings with the fire department, simple site diagrams on every enclosure, and clear exterior labeling (including staged-but-not-energized units). Doug Wilson stresses that “signage is not a formality,” which means that new construction needs proactive labeling. Claffey adds that lithium-ion can be safe enough when you plan for the emergency user, not just the end user—spacing and explosion analysis are table stakes. That’s not red tape; it’s your contingency plan.

4) Pick the right yardstick — cash flow over LCOS LCOS can turn into an academic tool unless inputs are truly “apples-to-apples,” as renewable energy expert Ilja Pawel said. Start by locking in must-have technicals and site constraints, then judge the deal on NPV and real cash flow over time. Litmus test: Begin with a clear picture of the application before a single LCOS chart hits the deck. That’s how you avoid pretty models that collapse in diligence.

5) Lithium’s bankability moat is widening — alternatives must clear a higher bar Every completed Li-ion project deepens its track record and accelerates its learning rate, raising the bar for challengers. Until new chemistries bring proof and productization that lenders can underwrite—performance data, warranties, service models—procurement will default to what was financed yesterday. Guests call this a widening bankability moat; to cross it, alternatives must meet buyers where they are.

Key Takeaways

  • Think like the buyer: meet technical minimums, then prove whole-life cash flows that a credit committee can defend.

  • Plan for the middle hours: prioritize 8–12-hour options and architectures that decouple power from energy.

  • Make safety a go/no-go gate: meet fire officials early; standardize signage, site diagrams, spacing, and explosion analysis (e.g., include UL9540A-style results).

  • Use the right metric: LCOS is a sanity check after apples-to-apples normalization; cash-flow/NPV drives awards. CapEx is a critical metric. Uptime matters.

  • Know the moat: lithium’s financed track record sets the baseline—alternatives must show bankable proof stacks.

Want the full conversations with the experts? Listen to the Beyond Lithium podcast here: https://open.spotify.com/show/0aWYga4Qa3OAKgwUVFd1KH?si=4df841982a194e30.

Previous
Previous

Why Modular Flow Batteries Might Be the Key to Clean Energy Scaling

Next
Next

The Case for Organic Flow Batteries: What CMBlu’s Leaders Say About Scaling Safe, Flexible Storage